This 1 1/2″ Fig 1002 Hammer Union is perfect for connections in high pressure operations.
This union is designed specifically for high-pressure applications. It provides a secure and reliable connection, making it ideal for critical operations in the oil and gas industry and other high-pressure environments.
Key Features
- Optimal Size: Specifically designed for 1 1/2″ pipes, ensuring a precise fit for your high-pressure piping needs.
- Fig 1002 Standard: Complies with Fig 1002 standards (set by the American Petroleum Institute, or API), indicating its suitability for pressures up to 10,000 PSI, making it a robust choice for high-pressure operations.
- Hammer Union Design: The hammer union design allows for quick and easy connections, facilitating efficient assembly and disassembly in demanding environments.
- Durable Construction: Crafted from high-quality materials, this hammer union ensures durability and resilience in challenging conditions, providing long-lasting performance.
- Versatile Applications: Suitable for a range of applications, including oil and gas drilling, well control, and other high-pressure industrial processes.
Common Applications for the 1 1/2″ Fig 1002 Hammer Union
- Oil and Gas Drilling Operations – In the drilling phase of oil and gas exploration, hammer unions like the 1 1/2″ Fig 1002 are employed to connect and secure various components of the drilling system, including pipes and drilling tools. They provide a reliable and quick-connect solution for the dynamic and high-pressure conditions encountered during drilling.
- Well Control Systems – Hammer unions play a crucial role in well control systems, especially during well completion and intervention activities. They facilitate the connection and disconnection of tools and equipment used in maintaining control over the wellbore, ensuring safe and efficient well operations.
- High-Pressure Industrial Processes – Beyond oil and gas, hammer unions find applications in various high-pressure industrial processes. Industries such as chemical, petrochemical, and manufacturing may utilize hammer unions to connect high-pressure piping systems, providing a robust and secure solution for fluid transport and control in demanding environments.
- Hydraulic Fracturing (Fracking) – In hydraulic fracturing operations, where high-pressure fluids are injected into the subsurface to stimulate oil or gas production, hammer unions are used to connect and secure the high-pressure hoses and pipes. Their quick-connect design allows for efficient assembly and disassembly during the setup and dismantling of fracking equipment.
- Pipeline Connections in Challenging Environments – Hammer unions are employed in pipeline construction and maintenance, especially in challenging environments such as offshore or rugged terrains. Their durable construction and ability to handle high pressures make them suitable for securely connecting pipeline components in conditions where standard connections might face challenges.
Install your high-pressure piping systems confidently with our 1 1/2″ Fig 1002 Hammer Union. Whether you’re involved in oil and gas operations or other industrial applications, this hammer union provides a critical component for secure and efficient connections in demanding and high-pressure environments.
Be sure to follow Branabee on social media!
Browse our other hammer unions here.
Shipping Countries:
United States (US)
Ready to ship in 1-3 business days
from United States (US)
Shipping Policy
To ensure your order is shipped safely and appropriately, we determine the shipping method based on weight, size, and handling requirements.
Parcel Shipments
Smaller items that meet standard carrier limits are shipped via common parcel carriers such as UPS, FedEx, or USPS. This is calculated for you automatically at checkout.
LTL Freight (Less-Than-Truckload)
Orders that:
Weigh over 150 lbs, or
Exceed parcel carrier size or dimensional limits
will ship via LTL freight.
LTL shipments are handled by third-party freight carriers and typically involve palletized delivery. Transit times and delivery scheduling vary depending on carrier availability, destination, and freight class.
Please note:
LTL deliveries often require a delivery appointment.
Liftgate service, limited access, or residential delivery may affect transit time and cost.
It is best to reach out to us before your purchase on items that exceed 150lbs or that are larger than 96 inches in any one direction in order to ensure that you get an accurate estimate on cost.
Full Truckload (FTL) / Specialized Freight
Large or specialized items—such as tanks, vessels, oversized equipment, or shipments requiring hazmat handling or oversized permits—are managed directly by Tri-State Supply.
These shipments may require:
Full truckload (FTL) transport
Oversized or overweight permits
Specialized carriers or equipment
Additional coordination prior to shipment
Because of this, processing and delivery timelines for full truckload or specialized freight are determined on a case-by-case basis. Our team will coordinate directly with you to confirm logistics before shipment. You will need to reach out to us for a quote. You may also arrange freight for your purchases. Loading fees, appointments, and more arrangements will still need to be agreed upon before something leaves our property.
Order Processing & Timing
Most in-stock orders are processed within 1–3 business days. Freight shipments—especially LTL and full truckload—may require additional time to schedule pickup and delivery.
Estimated delivery dates are provided as guidance and are subject to carrier and logistical factors beyond our direct control.
Questions Before You Order
If you are purchasing:
Large or heavy items
Freight-sensitive equipment
Job-site or residential deliveries
we strongly recommend contacting us before placing your order so we can help confirm the best shipping method and set clear expectations.
Tri-State Supply
Customer Support Hours
Monday–Friday, 8:00 AM – 5:00 PM CST
Please allow up to 24 business hours for a response.
Refund Policy
Tri-State Supply Corp
Return & Refund Policy
We want you to feel confident in every purchase from our store. As part of BranaBee, we follow the BranaBee Refund Policy (https://branabee.com/refund_returns/) and have added a few specifics to make returns as simple as possible.
1. Return Eligibility
We accept returns on new, unused items within 30 days of delivery, as long as the item is in a condition that allows it to be resold.
Items marked “As-Is” or “As-Is Where-Is” cannot be returned.
To qualify for a return, items must:
Be unused
Be in original or equivalent packaging
Be free from damage, installation marks, or modifications
Used or installed items are not eligible for return or refund.
2. How to Request a Return
To start a return:
Submit a return or refund request for your order.
If eligible, we will provide a return shipping label via email.
Once we receive and inspect the item, your refund will be issued to your original payment method.
3. Large, Heavy, or Freight-Shipped Items
Returns for large or freight items require special handling:
Our team will contact you to coordinate the return.
Return eligibility and logistics are handled case by case.
Timelines and costs may differ from standard parcel returns due to shipping requirements.
4. Non-Refundable Items
Used or installed items
Items returned after 30 days
Items damaged due to improper packaging or handling
5. Questions Before You Buy
For large or freight-shipped items, we recommend contacting us before ordering. This helps confirm specifications and return expectations.
For any other questions, reach out during business hours:
Monday–Friday, 8:00 AM – 5:00 PM CST
Please allow up to 24 business hours for a response.
✅ Bottom line: Our goal is to make your shopping experience smooth and worry-free. If you ever have a concern about a return, we’re here to help.
Reviews
There are no reviews yet.